Monument Park Monument
Monument repairs are in process at Monument Park. The monument wall caps and concrete face were crumbling. The repair scope of work includes bringing this monument up to the standard of the current entry monuments with the curved top, off-white tile face with stucco wainscoating and aluminum anodized lettering and logo. Work should be complete by the end of July.